In-Process Quality Control

Precision at Every
Production Step

Our IPQC system monitors every stage of silicone manufacturing -- from first article confirmation to patrol inspection, assembly verification, and packaging audits -- ensuring every piece meets exacting brand standards before it leaves our floor.

±0.1mm
Tolerance
2h
Patrol Cycle
100%
First Article
01 / Molding First Article

First Article
Confirmation & Parameter Logging

Every production run begins with a formal first article inspection. We lock in molding parameters, verify material compliance, and sign off dimensional conformity before mass production is authorized.

First article inspection on injection molding line

Documented Setup Sheet

Mold temperature, cycle time, pressure, curing time and material lot number are recorded on a controlled setup sheet, signed by the operator and QC engineer.

Material Traceability

Raw silicone batch IDs, pigment ratios and curing agent amounts are logged -- enabling complete traceability from finished product back to incoming material certification.

Triple Sign-Off

The first 3 pieces must pass dimensional, visual and functional verification signed by operator, line leader, and IPQC before green-lighting the batch.

3 pcs
Minimum first article sample
100%
Parameters locked before run
02 / Patrol Inspection

Dimensional, Appearance
& Color Patrol

Trained IPQC inspectors conduct scheduled patrols across every production line, cross-checking critical dimensions, surface quality and color consistency against the approved golden sample.

Dimensional Check

Calipers, gauges and projectors verify every critical dimension against the drawing -- tolerance held to ±0.1mm.

  • ◆ CMM & 2D projectors
  • ◆ Wall thickness micrometers
  • ◆ Hardness Shore A/00 testers

Appearance Audit

Surface, flash, bubbles, scratches and mold marks are inspected under standard D65 lighting conditions.

  • ◆ No visible flash > 0.1mm
  • ◆ No air bubbles / voids
  • ◆ Golden sample reference

Color Consistency

Pantone cards and spectrophotometer readings verify ΔE values batch-to-batch to maintain brand color integrity.

  • ◆ ΔE ≤ 1.5 target
  • ◆ Pantone TPG/TCX library
  • ◆ Light box D65/TL84/UV
03 / Secondary Processes

Printing, Bonding
& Assembly Verification

Beyond molding, every secondary process is a potential variable. Our IPQC team validates silk-screen, pad printing, UV coating, adhesive bonding and multi-part assembly at defined intervals.

Silk screen and bonding inspection station
Printing

Ink Adhesion

3M tape test, cross-hatch, alcohol rub cycles and curing temperature logs.

Bonding

Adhesive Strength

Peel and shear strength tested; adhesive mixing ratios and curing time logged.

Assembly

Fit & Function

Mating force, snap-fit retention and functional cycle test on sampled units.

Coating

UV / Spray

Film thickness, gloss, color uniformity and abrasion resistance checked.

Packaging first article verification
Carton Audit
Count · Label · Shipping Mark
04 / Packaging IPQC

Packaging First Article
& Completeness Check

Before mass packing starts, we verify the complete packaging configuration -- barcode, label, user manual, accessories, inner carton, master carton and shipping marks all against the approved packing specification.

Barcode & Label Scan
UPC/EAN scanned, color/size/revision verified.
Accessory Set Completeness
Every included part verified against BOM.
Carton Drop & Weight Test
ISTA-style drop and gross weight tolerance.
05 / Containment & Response

Abnormal Isolation, Line Stop
& Corrective Actions

When any deviation is detected during IPQC, our response protocol activates immediately -- stopping the line, isolating suspect material, and triggering a formal CAPA (Corrective & Preventive Action) workflow.

01

Red Tag Isolation

Suspect goods immediately red-tagged and moved to the quarantine zone to prevent cross-mixing with conforming product.

02

Line Stop Authority

IPQC inspectors hold the authority to stop any line if defect rate exceeds set thresholds -- no production manager override.

03

Root Cause Analysis

5-Why and Fishbone analysis conducted with Engineering, Production and QC to identify true root cause.

04

CAPA & Validation

Corrective actions implemented and effectiveness validated after 3 production cycles. SOPs updated accordingly.

≤15min
Isolation Response
24h
CAPA Draft
3x
Validation Cycles
100%
SOP Update
06 / Records & Traceability

Patrol Records
& Accountability

Every patrol is signed, dated and archived. QC personnel are assigned to specific lines, creating clear accountability from inspector to supervisor to QA manager.

Request a sample record template
IPQC Patrol Log - Line A-07
Shift 2 · Day 142
Time Check Item Result Inspector
08:30First ArticlePASSL. Chen
10:30Dim. PatrolPASSL. Chen
12:30Color ΔE1.4 OKW. Zhao
14:30Flash CheckPASSW. Zhao
16:30Pkg First Art.PASSW. Zhao
Reviewed by: Y. Lin (QA Supervisor)
Archived · Retention 5 years
5y
Record Retention
1:1
Line to Inspector
Digital
MES Traceable
Special Process Request

Have unique IPQC
quality requirements?

Share your project specifications -- tolerances, test methods, record formats, or compliance standards. Our QA engineering team will tailor an inspection protocol for your production.

  • Custom inspection SOPs
  • Branded QC record templates
  • Pre-shipment audit coordination

We respond to all inquiries within 24 hours.