OEM / ODM Process

From Concept to
Mass Production

A transparent 7-stage workflow built on 15 years of silicone manufacturing expertise. We transform your sketches, specifications, or finished references into certified, market-ready products -- with zero compromises on precision, safety, or lead time.

7
Rigorous Stages
15+
Years Experience
±0.1mm
Tolerance Control
100%
Food-Grade
STAGE 01

Requirements &
Project Assessment

Every partnership begins with deep listening. We collect your product brief, intended market, and compliance needs -- then our engineering team evaluates feasibility within 48 hours.

Response within 48 hours

1 Information We Need From You

▸Product sketches / 3D files / samples
▸Target market & certifications
▸Estimated annual order quantity
▸Color, hardness & finish preferences
▸Packaging & branding needs
▸Target delivery timeline

2 Our Internal Evaluation

  • Material selection (solid vs. liquid silicone)
  • Structural feasibility & molding risks
  • Secondary process requirements (printing, bonding)
  • Preliminary cost & capacity planning

Itemized Quote

Transparent breakdown: unit price, tooling, secondary processes, packaging, and certifications.

Technical Proposal

Material grades, manufacturing method, QC plan, and estimated production timeline.

Milestone Schedule

Clearly defined checkpoints from mold completion to final shipment.

NDA & Contract

Mutual confidentiality protection and clear commercial terms before kickoff.

STAGE 02

Quotation &
Partnership Confirmation

Within 3-5 working days of assessment, we deliver a complete commercial package. No hidden costs, no vague timelines -- just a clear path to greenlight your project.

STAGE 03

Design, DFM &
Mold Development

Our engineering team optimizes your design for manufacturability (DFM), then crafts precision tooling built to withstand hundreds of thousands of cycles with consistent output.

01

3D Design & DFM Review

Engineers refine wall thickness, draft angles, parting lines, and gate placement to eliminate defects before tooling begins.

  • Shrinkage compensation
  • Flow simulation analysis
02

Precision Mold Fabrication

In-house CNC machining with hardened steel tooling, delivering ±0.1mm cavity accuracy and polished surface finishes.

  • P20 / H13 / S136 steel options
  • Multi-cavity capability
03

Mold Validation

Trial injections verify dimensional accuracy, demolding smoothness, and surface quality -- before any production run.

  • CMM inspection reports
  • T0 / T1 sample delivery
STAGE 04

Prototyping, Testing &
Sample Approval

Before mass production is authorized, samples undergo rigorous laboratory and in-use testing. You receive golden samples and complete test reports for sign-off.

Silicone product laboratory testing

Tensile Strength Test

Material toughness improved by 45% -- maintains elasticity after long-term stretching cycles.

Temperature & Humidity Cycling

Validates performance stability from -40°C to 230°C across varied humidity environments.

Aging & Tear Resistance

Accelerated UV + ozone exposure confirms long-term durability against discoloration and material fatigue.

Certification Testing

FDA, LFGB, RoHS, REACH, and CE compliance -- all documentation prepared for your import clearance.

Golden Sample Sign-off

Mass production begins only after your written approval of the final sample. Golden samples are archived as the production reference standard.

STAGE 05

Material, Production &
In-Process Quality Control

64 injection machines operating under ISO 9001 protocols. Every production line is staffed by QC inspectors with 5+ years of silicone-specific experience.

Production Capacity
64
injection machines
Solid Silicone Lines 32
Liquid Silicone (LSR) Lines 32
QC Staff per Line 5y+
01

Raw Material IQC

100% food-grade silicone verified via RoHS & REACH testing before entering the warehouse.

02

First Article Inspection

Each production shift begins with a FAI check against the golden sample baseline.

03

In-Process Patrol

Rotating QC inspectors verify dimensions, flashing, and finish every 2 hours per SOP.

04

Secondary Processing

Silkscreen, UV, pad printing, bonding, and adhesive backing -- all executed in-house.

A

Full Inspection (FQC)

Pre-packing inspection covering appearance, dimensions, function, and adhesion -- strictly following SOP standards with random sampling verification.

B

Custom Packaging

Branded retail boxes, polybags, hangtags, barcode labels, master cartons -- fully customized to your market's retail requirements.

C

Pre-Shipment Audit

Welcome third-party inspections (SGS, BV, Intertek) or customer on-site audits before container loading.

D

Global Logistics

FOB, CIF, DDP options via trusted forwarders. Full export documentation including CO, FDA letters, and MSDS where applicable.

E

After-Sales Follow-up

Dedicated account manager stays with your project after shipment -- handling claims, reorders, and continuous improvement iterations.

STAGE 06 -- 07

Packaging, Shipping &
After-Sales Support

Our commitment doesn't end at the factory gate. We package your product to retail-shelf standards, coordinate global logistics, and support your brand long after delivery.

Start Your Project

Ready to turn your idea into
production reality?

Download our capability deck or send your project brief directly. Our engineering team responds within 48 hours.

Project Brief Checklist

  • Product reference images or 3D files
  • Target market & required certifications
  • Estimated annual purchase quantity
  • Color, hardness & finish preferences
  • Target delivery timeline