Solutions for Product Development Teams

Engineering Partners for Your R&D Pipeline

From early-stage concept review to validated mass production, YMS integrates with your product development team as a dedicated silicone manufacturing partner. Fifteen years of OEM/ODM experience, 64 production lines, and a disciplined engineering workflow -- built to accelerate your launch cycles.

15yrs
OEM/ODM Experience
±0.1mm
Tolerance
64
Production Lines
01 · Alignment

Requirements, Specs & Technical Document Handover

A structured intake process ensures nothing is lost in translation between your engineers and our tooling team. We align on performance, geometry, materials, and compliance before a single mold is cut.

  • Supported: STEP, IGES, STL, 2D drawings (PDF/DWG)
  • Material datasheets, hardness, color standards (Pantone)
  • Compliance targets: FDA, LFGB, RoHS, REACH, CE
1

Requirement Intake Form

Structured brief covering function, environment, lifecycle, target MOQ, markets, and certification scope.

2

CAD & Drawing Review

Our engineering team parses 3D geometry, critical-to-quality dimensions, GD&T, and marks ambiguities for sign-off.

3

Specification Freeze

A locked technical spec sheet (TSS) is co-signed -- material grade, hardness Shore A, tolerance class, surface finish, color.

4

Dedicated Project Engineer

A single technical point-of-contact owns communication from kickoff through mass production transfer.

02 · Engineering Review

Structural Review, DFM & Material Recommendations

Before tooling begins, we deliver a documented Design-for-Manufacturing analysis -- identifying moldability risks, suggesting geometry refinements, and recommending the optimal silicone chemistry for your use case.

Moldflow Simulation

Gate location, flow balance, air traps, and shrinkage prediction before cutting steel.

Material Selection

HTV solid vs. LSR liquid silicone, hardness 20-80 Shore A, platinum vs. peroxide cure guidance.

DFM Report

Annotated 3D views flagging undercuts, wall-thickness variance, parting-line placement, and ejection strategy.

Multi-Material Co-Molding

Silicone-to-plastic, silicone-to-metal bonding strategies for insert and over-molded assemblies.

Compliance Mapping

Food-contact, skin-contact, infant-care -- the right grade for your target regulatory region.

Design Iteration Loop

Mark-ups returned within 48-72 hours -- your team iterates, we re-validate, until the design is production-ready.

03 · Validation

Prototyping, Samples & Stage Validation

A gated sampling workflow de-risks every milestone. Each stage produces documented evidence -- so your product managers, QA leads, and compliance teams can approve with confidence.

Stage 01

3D-Printed Prototype

Form, fit, and ergonomic validation. Lead time: 3-5 days.

  • · SLA / SLS resin
  • · Dimensional check
  • · Visual sign-off
Stage 02

Soft-Tool Sample

Real silicone from a rapid aluminum mold. 7-14 days.

  • · Material feel validation
  • · Hardness verification
  • · Functional testing
Stage 03

Engineering Pilot (EP)

Production-tool samples with full process parameters locked.

  • · Tensile & tear tests
  • · Aging & temperature
  • · Compliance submission
Stage 04

Production Validation (PPAP)

Golden samples, process capability study, final approval package.

  • · Cpk reports
  • · Control plan
  • · Mass-production green light
04 · Governance

Cost, Risk & Engineering Change Management

Transparent costing, documented risk tracking, and a formal ECN (Engineering Change Notice) process keep your program predictable -- even when the design evolves mid-flight.

Engineering change workflow illustration

Transparent Cost Breakdown

Line-item quotes separating tooling amortization, material, cycle time, secondary processing, and packaging. Target-cost engineering collaboration available.

Risk Register & FMEA

Design and Process FMEA documents maintained throughout the program, with mitigation owners and status visible to both teams.

Engineering Change Notice (ECN)

Formal change-control: impact assessment on cost, lead time, tooling, and certification -- approved in writing before implementation.

Program Dashboard

Weekly status reports: milestone progress, open issues, sample status, and tooling health -- delivered in a format your PMO can consume.

05 · Scale

Mass Production Transfer & Quality Standard Handover

The transition from engineering pilot to volume production is where most programs stumble. Our structured NPI-to-MP handover ensures the standards you validated are the standards we ship -- every batch, every month.

Golden Sample & SOP Lock-in

Approved golden samples are retained for the program lifetime. Every parameter -- curing temperature, pressure, cycle time, trim spec, QC checkpoints -- is codified in a signed SOP.

ISO 9001
Quality System
AQL 1.5
Default Sampling
100%
Visual Inspection
5+ yrs
QC Experience / Line

PPAP / FAI Package

Dimensional reports, material certs, process capability study, control plan -- delivered for your sign-off.

In-Process Controls

SPC on critical dimensions, mold maintenance logs, batch traceability from material lot to carton.

Final Outbound QC

Full-check on appearance, dimensions, function, and adhesion before packaging -- SOP-driven, auditable.

06 · Trust

Confidentiality & Cross-Team Collaboration

Your IP and go-to-market plans deserve the same discipline as your engineering files. We operate under signed NDAs, controlled file access, and structured communication rhythms with your product, engineering, QA, and supply-chain stakeholders.

Mutual NDA signed before any file exchange
Covers CAD files, tooling, test data, and launch timelines.

IP Protection

Dedicated tooling never shared; CAD on access-controlled systems; employee IP agreements enforced.

Multi-Stakeholder Comms

Separate channels and cadences for engineering, QA, and procurement -- the right data to the right person.

Time-Zone Coverage

Engineering responses within one business day. Scheduled calls across US, EU, and APAC working hours.

Document Version Control

Every revision -- CAD, drawings, test reports, SOPs -- is logged, versioned, and auditable.

Book a Technical Review

Walk us through your
development roadmap.

A 45-minute call with our senior engineering team. Share your CAD, timeline, and target markets -- leave with concrete DFM feedback and a program outline.

  • NDA signed before any file review
  • Senior project engineer on the call
  • Written DFM summary within 72 hours

Reach the engineering team

Request Technical Review