Engineering Partners for Your R&D Pipeline
From early-stage concept review to validated mass production, YMS integrates with your product development team as a dedicated silicone manufacturing partner. Fifteen years of OEM/ODM experience, 64 production lines, and a disciplined engineering workflow -- built to accelerate your launch cycles.
Requirements, Specs & Technical Document Handover
A structured intake process ensures nothing is lost in translation between your engineers and our tooling team. We align on performance, geometry, materials, and compliance before a single mold is cut.
- Supported: STEP, IGES, STL, 2D drawings (PDF/DWG)
- Material datasheets, hardness, color standards (Pantone)
- Compliance targets: FDA, LFGB, RoHS, REACH, CE
Requirement Intake Form
Structured brief covering function, environment, lifecycle, target MOQ, markets, and certification scope.
CAD & Drawing Review
Our engineering team parses 3D geometry, critical-to-quality dimensions, GD&T, and marks ambiguities for sign-off.
Specification Freeze
A locked technical spec sheet (TSS) is co-signed -- material grade, hardness Shore A, tolerance class, surface finish, color.
Dedicated Project Engineer
A single technical point-of-contact owns communication from kickoff through mass production transfer.
Structural Review, DFM & Material Recommendations
Before tooling begins, we deliver a documented Design-for-Manufacturing analysis -- identifying moldability risks, suggesting geometry refinements, and recommending the optimal silicone chemistry for your use case.
Moldflow Simulation
Gate location, flow balance, air traps, and shrinkage prediction before cutting steel.
Material Selection
HTV solid vs. LSR liquid silicone, hardness 20-80 Shore A, platinum vs. peroxide cure guidance.
DFM Report
Annotated 3D views flagging undercuts, wall-thickness variance, parting-line placement, and ejection strategy.
Multi-Material Co-Molding
Silicone-to-plastic, silicone-to-metal bonding strategies for insert and over-molded assemblies.
Compliance Mapping
Food-contact, skin-contact, infant-care -- the right grade for your target regulatory region.
Design Iteration Loop
Mark-ups returned within 48-72 hours -- your team iterates, we re-validate, until the design is production-ready.
Prototyping, Samples & Stage Validation
A gated sampling workflow de-risks every milestone. Each stage produces documented evidence -- so your product managers, QA leads, and compliance teams can approve with confidence.
3D-Printed Prototype
Form, fit, and ergonomic validation. Lead time: 3-5 days.
- · SLA / SLS resin
- · Dimensional check
- · Visual sign-off
Soft-Tool Sample
Real silicone from a rapid aluminum mold. 7-14 days.
- · Material feel validation
- · Hardness verification
- · Functional testing
Engineering Pilot (EP)
Production-tool samples with full process parameters locked.
- · Tensile & tear tests
- · Aging & temperature
- · Compliance submission
Production Validation (PPAP)
Golden samples, process capability study, final approval package.
- · Cpk reports
- · Control plan
- · Mass-production green light
Cost, Risk & Engineering Change Management
Transparent costing, documented risk tracking, and a formal ECN (Engineering Change Notice) process keep your program predictable -- even when the design evolves mid-flight.
Transparent Cost Breakdown
Line-item quotes separating tooling amortization, material, cycle time, secondary processing, and packaging. Target-cost engineering collaboration available.
Risk Register & FMEA
Design and Process FMEA documents maintained throughout the program, with mitigation owners and status visible to both teams.
Engineering Change Notice (ECN)
Formal change-control: impact assessment on cost, lead time, tooling, and certification -- approved in writing before implementation.
Program Dashboard
Weekly status reports: milestone progress, open issues, sample status, and tooling health -- delivered in a format your PMO can consume.
Mass Production Transfer & Quality Standard Handover
The transition from engineering pilot to volume production is where most programs stumble. Our structured NPI-to-MP handover ensures the standards you validated are the standards we ship -- every batch, every month.
Golden Sample & SOP Lock-in
Approved golden samples are retained for the program lifetime. Every parameter -- curing temperature, pressure, cycle time, trim spec, QC checkpoints -- is codified in a signed SOP.
PPAP / FAI Package
Dimensional reports, material certs, process capability study, control plan -- delivered for your sign-off.
In-Process Controls
SPC on critical dimensions, mold maintenance logs, batch traceability from material lot to carton.
Final Outbound QC
Full-check on appearance, dimensions, function, and adhesion before packaging -- SOP-driven, auditable.
Confidentiality & Cross-Team Collaboration
Your IP and go-to-market plans deserve the same discipline as your engineering files. We operate under signed NDAs, controlled file access, and structured communication rhythms with your product, engineering, QA, and supply-chain stakeholders.
IP Protection
Dedicated tooling never shared; CAD on access-controlled systems; employee IP agreements enforced.
Multi-Stakeholder Comms
Separate channels and cadences for engineering, QA, and procurement -- the right data to the right person.
Time-Zone Coverage
Engineering responses within one business day. Scheduled calls across US, EU, and APAC working hours.
Document Version Control
Every revision -- CAD, drawings, test reports, SOPs -- is logged, versioned, and auditable.
Walk us through your
development roadmap.
A 45-minute call with our senior engineering team. Share your CAD, timeline, and target markets -- leave with concrete DFM feedback and a program outline.
- NDA signed before any file review
- Senior project engineer on the call
- Written DFM summary within 72 hours
Reach the engineering team
-
Emailedwin@gd-yums.com
-
Phone / WhatsApp+86 13418983587
-
FactoryDongguan, Guangdong, China